The Town of Colchester is requesting bids for a stormwater project at Midnight Pass and Everbreeze Drive in Colchester, VT. The project will include the installation of three separate subsurface stormwater treatment chamber systems. Two will be installed under the roadway surface on Everbreeze Drive and one will be installed under a grassed area on Midnight Pass.

Additional project tasks include the installation of underground piping, catch basins, and rock outlet protection. The contractor is expected to repave sections of disturbed roadway, and reestablish topsoil and vegetation where disturbed. Please call 802-264-5621 or email akubala@colchestervt.gov to receive the bid and contract documents.